> ## Knowledge Base Index
> Fetch the complete knowledge base index at: https://help.novalya.com/sitemap.xml
> Use this file to discover available pages before exploring further.
> Pure-Markdown content can be obtained by appending a '.md' suffix to the content URLs listed in the sitemap (without the trailing slash).

# What's the difference between pipeline, tag and stage in Novalya?

# What's the difference between pipeline, tag and stage in Novalya?

**Reading time:** 3 min

**Quick summary:** Currently in Novalya, a pipeline and a tag are the same thing. When you add a contact to a pipeline, you apply a tag to them. Stages are columns inside a pipeline. In the near future, pipelines and tags will be separated.

---


## The new Workspace and your current space

This section applies **when the new Workspace is available in your account**. It does not mean that your subscription or data has already been migrated. If you still see the legacy space, use its functions and your current terms; do not delete accounts to force a transition.

In the new Workspace, **pipelines, stages and tags are separate objects**. A pipeline organizes a journey; a stage locates a contact within that pipeline; a tag describes the contact and can be shared at Workspace level. Creating a tag does not mean creating a pipeline.

Tags are shared across the Workspace's accounts and platforms. Pipelines and stages belong to the selected social account. The same contact may belong to several pipelines and have a stage in each.

The new grid provides 5 / 10 / 15 pipelines per account for Starter / Pro / Business, with unlimited tags. These capacities apply to the corresponding new offer and do not automatically replace a legacy subscription's rights.

Your subscription, price and previously granted historical rights remain preserved. The new Starter / Pro / Business grid caps purchased slots at 5 / 10 / 15; those caps do not automatically remove historical rights.

**The retained instructions below concern the legacy Novalya space.** They do not describe the new Workspace's multi-account capabilities or tag organization.

---

## Pipeline = Tag (currently)

In Novalya's current system:

**A pipeline is a tag, and a tag is a pipeline.**

| Element | What it is |
|---------|------------|
| **Pipeline** | Kanban-style visual organization with stages |
| **Tag** | Label applied to contact on Messenger/Instagram |
| **Today** | Both are identical |

---

## Concrete example

You create a pipeline called **"Hot prospects"** with **red** color.

**What happens:**
1. In Novalya CRM → You see a "Hot prospects" pipeline (red)
2. On Messenger/Instagram → Contact has "Hot prospects" tag (red)
3. It's the **same element**, just displayed differently

**When you add a contact to this pipeline:**
- ✅ They appear in "Hot prospects" pipeline in CRM
- ✅ They automatically have "Hot prospects" tag on Messenger/Instagram

**When you apply "Hot prospects" tag to a contact:**
- ✅ They're automatically added to "Hot prospects" pipeline in CRM

| Same action, two different interfaces.

---

## Stages: columns in a pipeline

A **stage** is a **column** inside a pipeline.

**Example pipeline with 4 stages:**

```
Pipeline "Hot prospects" (red)
│
├─ Stage 1: Contacted
├─ Stage 2: Conversation
├─ Stage 3: Follow-up needed
└─ Stage 4: Converted
```

---

## What are stages for?

Stages allow **tracking a contact's progress** through your process.

**A contact can:**
- Be in **one or multiple pipelines** (tags)
- But in **only one stage per pipeline**

**Example:**
- Contact "Marie" can be in:
  - Pipeline "Hot prospects" → Stage "Conversation"
  - Pipeline "Q1 Campaign" → Stage "Contacted"
  - Pipeline "VIP" → Stage "Regular follow-up"

---

## Visual differences

### In Novalya CRM

| Element | What you see |
|---------|--------------|
| **Pipeline** | Title + color at top (e.g., "Hot prospects" red) |
| **Stages** | Vertical columns (Contacted, Conversation, etc.) |
| **Contacts** | Movable cards in stages |

### On Messenger/Instagram

| Element | What you see |
|---------|--------------|
| **Tag** | Colored badge next to contact name |
| **Tag name** | "Hot prospects" (same name as pipeline) |
| **Stages** | Not visible on Messenger/Instagram |

| Stages are only visible in Novalya CRM.

---

## Summary: Pipeline vs Tag vs Stage

| Element | Definition | Where it's visible | How many per contact |
|---------|------------|-------------------|---------------------|
| **Pipeline** | CRM organization + Automatic tag | Novalya CRM | Multiple possible |
| **Tag** | Contact label (= Pipeline) | Messenger/Instagram | Multiple possible |
| **Stage** | Column in a pipeline | Novalya CRM only | 1 per pipeline |

---

## What will change soon

In the **near future**, Novalya will **separate pipelines and tags**.

**What this will mean:**
- A **pipeline** = CRM organization only
- A **tag** = independent label
- You can apply tags **without creating a pipeline**
- You can create pipelines **without creating a tag**

**Why this change?**
- More flexibility
- Better organization
- Clear separation between CRM tracking and labeling

| For now: Pipeline = Tag. It's simpler and works very well.

---

## Usage examples

### Example 1: Sales organization

**Pipeline created:** "Sales pipeline" (blue)

**What happens automatically:**
- Tag "Sales pipeline" (blue) created
- Contacts added to pipeline = tag applied on Messenger

**Configured stages:**
1. Contacted
2. Quote sent
3. Negotiation
4. Won

**Result:**
- In CRM → Clear visual tracking of progress
- On Messenger → Blue tag for quick identification

---

### Example 2: MLM segmentation

**Pipelines created:**
- "Prospects" (yellow)
- "Distributors" (green)
- "Leaders" (red)

**What happens:**
- 3 tags automatically created with same names/colors
- On Instagram DM → Colored badges for quick identification
- In CRM → 3 separate pipelines for organization

**A contact can be in multiple:**
- Contact "Paul" = Prospect (yellow) + Summer campaign (orange)
- → 2 pipelines/tags applied

---

## FAQ

**If I rename a pipeline, is the tag also renamed?**

Yes. Since pipeline = tag, renaming one automatically renames the other.

**If I delete a pipeline, is the tag deleted?**

Yes. Deleting a pipeline automatically deletes the associated tag and removes all contacts from this pipeline/tag.

**Can I create a tag without a pipeline?**

No, not currently. To create a tag, you must create a pipeline. This is what will change in the future update.

**How many pipelines/tags can I create?**

It depends on your plan: 3, 10 or 25 pipelines/tags.

**Can a contact have multiple tags/pipelines?**

Yes. A contact can be in multiple pipelines (= have multiple tags). But they can only be in **one stage per pipeline**.

---

|| **Related articles:**
|| - How does Novalya CRM work?
|| - How to create a pipeline and choose its color?
|| - Can I put a contact in multiple pipelines?
|| - How to add, rename or delete stages?

---

## Need help?

If you have questions about pipelines, tags and stages, our support team is available:

- **Email:** support@novalya.com
- **Ticket Center:** Available from your Novalya space

Our team aims to reply within 24 hours on business days.